Under construction

Update 22 March 2007 

Last week the preparation of the floor in the factory has started. The concrete floor is ready but needs to dry before the machines can be installed.

 The machines are bought and waiting to be shipped to Tering (Indonesia). Our expectation is that the factory will be up and running mid April.

Event

The 8th of June we will be organizing an event for the Timber Processing Factory. It will be a cultural event with an Indonesian diner, dance performances, presentation of our project and Indonesian band. For this event we have already arranged funding from two sponsors and several prices for our lottery are donated.